Help Complete the University Mosque

🏗 Remaining Constructions & Development Projects – Jamia Baitul Ateeq

Help Strengthen the Future of Jamia Baitul Ateeq

Alhamdulillah, the main Jamia Mosque has been fully constructed and is now in daily use by hundreds of students.
Only the Solar System and some final window installations remain. At the same time, several key academic, hostel,
and residential buildings are still under construction to serve more than 2,500 students.

Mosque Completed – Solar & Windows Pending

The Jamia Mosque structure, interior, marble, electrical works, doors, and lighting are now fully complete.
Students regularly use the mosque for prayers, revision, and dars. The only remaining work is:

• Installation of a 30 kW Solar Hybrid System to reduce electricity costs and ensure continuous power for fans, lights, and sound.
• Final Aluminum Window Installation to improve ventilation, noise control, and insulation.

🕌 Mosque 100% structurally complete
🌞 Solar & windows = Sadaqah Jariyah
🎓 2,500+ students benefit daily

Every unit of electricity saved, every prayer made, and every lesson learned in this mosque will be a source of ongoing reward
for those who help complete this final phase of work. True Sadaqah Jariyah.

Academic & Campus Buildings

1. Main Academic Block (U-Shaped) – 2 Floors Remaining

Current: Ground + 1 floor completed.
Remaining: Construction of two additional floors to accommodate more students for Nazirah, Hifz, School, and Dar-ul-Quran.

Work Required:

  • RCC slab casting for Floor-2 and Floor-3
  • Brick masonry, plaster, and external elevation
  • Floor tiling and skirting
  • Electrical wiring, DB panels, and lighting
  • Plumbing lines and washroom blocks
  • Ceiling, doors, and windows

2. Front Block – 4 Classrooms + Lobby (From Basement)

This block will include a basement and ground level with four classrooms and a lobby for junior and girls’ classes.

Work Required:

  • Basement RCC slab and retaining walls
  • Ground floor classrooms and central lobby
  • Internal plaster, flooring, and ceilings
  • Staircase and handrails
  • Windows, doors, and basic furnishings
These academic spaces will add capacity for hundreds of additional students who are already on Jamia’s waiting list but cannot yet be accommodated due to lack of space.

Hostels, Quarters & Utilities

3. Boys & Girls Hostels – Finishing & Extensions

Remaining works include:

  • Floor tiling and washroom finishing
  • Metal windows and doors
  • Beds, cupboards, and basic furniture
  • Fans, lights, and backup wiring for solar integration

4. Teachers’ Quarters – 4 Floors

Ten teachers’ quarters are planned over four floors. This project is still largely pending.

  • Complete RCC structure for all floors
  • Internal partitions, kitchens, and washrooms
  • Water tanks and plumbing connections
  • Electrical, ventilation, and front elevation

5. Security, Electrical & Water Systems

  • Campus-wide CCTV and door/window sensors
  • New DB panels and submain wiring for all blocks
  • Fans and lights for new floors and rooms
  • Underground water tanks and booster pumps
  • Improved drainage and rainwater management
These works ensure that the entire campus remains safe, functional, and sustainable for 2,500+ students and staff across all branches of Jamia Baitul Ateeq.

Estimated Cost Summary – Remaining Development
Approximate ranges based on current market rates. Detailed BOQs and audited reports can be shared with serious donors and CSR partners.
Project Estimated Cost (PKR)
Mosque Solar System (30 kW Hybrid) 3,200,000 – 4,000,000
Mosque Aluminum Windows – Final Phase 850,000 – 1,200,000
Main Academic Block – 2 Additional Floors 48,000,000 – 55,000,000
Front Block – Basement + Ground Classrooms 18,000,000 – 22,000,000
Boys Hostel Extension & Finishing 9,500,000 – 12,000,000
Girls Hostel Expansion & Facilities 14,000,000 – 16,000,000
Teachers’ Quarters (4 Floors) 30,000,000 – 38,000,000
Security & CCTV System 1,800,000 – 2,500,000
Electrical (Fans, Lights, Panels) 2,000,000 – 3,000,000
Water Tanks & Plumbing Infrastructure 1,300,000 – 1,800,000
Total Remaining Development (Approx.) PKR 130,000,000 – 150,000,000

Sadaqah Jariyah • Mosque Solar & Windows
Complete the Final Phase of the Mosque

Support the 30 kW solar system and final window installation for the Jamia Mosque. Your contribution will continuously power
prayers, Qur’an recitation, and knowledge – day and night – for years to come.

Suggested Giving: PKR 25,000 • 50,000 • 100,000 • 500,000 or any amount from your means.

Bank details and official receipts are provided for every donation. Zakat, Sadaqah, and CSR contributions are all welcome.

Education • Hostels • Teachers’ Quarters
Partner in Building a Complete Islamic Campus

Corporate partners, families, and individual donors can adopt a floor, a classroom, a hostel wing, or a teachers’ quarter.
Jamia Baitul Ateeq’s audited structure and legal registrations ensure full transparency and long-term impact.

For CSR / Large Donations: Named blocks, plaques, and dedicated reports can be arranged.

Detailed BOQs, layouts, and audited reports are available for serious partners and CSR teams upon request.