Founded & guided by Shaykh al-Hadith Hazrat Maulana Hasan Rabbani Sahib
Jamia Baitul Ateeq — Educational, Welfare & Development Projects
Established in 2004 in Karachi, Jamia Baitul Ateeq serves 2,500+ male and female students through Quran education, Hifz, Dars-e-Nizami, school education, tarbiyah and student welfare.
Students
Residential students
Teachers & staff
Dated monthly spending records
Education
Jamia’s current public enrollment figure is 2,500+ students. The Petrichor School serves 650 students. Older programme allocations, including the former school figure of 600, have not been reconciled into a new precise overall total; such figures should not be summed into a current enrollment claim.
Residential Student Welfare
Jamia serves 2,500+ male and female students. Islamic and school education is completely free. Eligible and relevant students receive accommodation, meals, basic medical support and other welfare facilities according to programme and need, without charge. Approximately 950 students are currently residential.
Food Support
Food is a major variable recurring cost. The CSR campaign planning benchmark is approximately PKR 300 per student per day (approximately PKR 9,000 per 30 days); this is a planning benchmark, not an audited actual meal cost. The flour-use baseline is approximately 190 kg per day. Enrollment is not the same as residential or meal attendance, so the benchmark must not be multiplied by total enrollment to claim an actual daily cost. Market prices and the number of meals served can change actual expenditure; request the latest dated food requirement before making a large restricted contribution.
TRANSPARENCY • JULY–SEPTEMBER 2026
Monthly Expenditure: A Dated Record
Review Jamia’s recorded operating expenditure before discussing a contribution.
What these figures mean: dated expense records, not proof of payment, a reconciled funding shortfall or an approved current fundraising target. September’s total was checked against the current Google Sheet on 14 October 2026.
Management separately reports approximately PKR 8.2 million in September arrears. Receipts and payments still require reconciliation; this is not an additional amount to add to the expense total.
Review financial records → Discuss a current funding requirement →
Source context, salary figures & reconciliation notes
Recent management-provided monthly expenditure records are PKR 6,794,749 for July 2026 and PKR 6,730,183 for August 2026. The September 2026 expense-ledger total is PKR 8,260,284 (approximately 82.60 lakh), checked against the current Google Sheet on 14 October 2026. This recorded total is not proof of payment or a reconciled net shortfall. Management separately reports approximately PKR 8.2 million in September arrears; receipts and payments still require reconciliation. These dated ledger totals are not a fixed recurring budget or approved current fundraising target. For a major or restricted contribution, request the underlying financial statement and current requirement from Jamia.
Within Jamia’s operations, management separately reports monthly salaries of approximately PKR 1,250,000–1,275,000. This is part of operational spending, not an additional amount to add to the overall monthly baseline. School-network annual payroll is reported separately on its school page.
Purpose-led support • Karachi, Pakistan
Find a Project. Make a Meaningful Contribution.
Explore education, student welfare and development priorities. Each pathway connects you with the relevant programme or Jamia’s team to discuss a clearly defined contribution.
Requirement and status reference: October 2026
Daily food support
Food & ration
Daily flour-use baseline: approximately 190 kg. Delivery quantities are confirmed with Jamia for each contribution.
Explore food supportStudent wellbeing
Medicines & healthcare
Case-specific medical requirements are available from Jamia. Historical medical bills do not represent current needs.
Explore healthcareLearning resources
Education & books
Course sets, books and learning materials, with current quantities confirmed before support.
Explore educationStudent facilities
Accommodation & utilities
Facility, utilities and equipment requirements are scoped with the administration.
Discuss facility needsWomen’s education
Women’s Campus C-48
Recorded renovation and development work, with the latest requirements available through the campus project.
View campus recordRemaining facilities
Main Jamia Masjid
The main building is complete. Review the separately tracked remaining works, current phase and quotations.
View mosque projectInfrastructure
Water / RO
Current scope and itemized quotations are confirmed before a water-system partnership.
Discuss water supportInfrastructure
Solar / energy
Current scope and itemized quotations are confirmed before an energy partnership.
Discuss energy supportLearning spaces
Furniture
Desks and furniture for learning spaces, with quantities confirmed before purchasing.
View school needsDevelopment Status at a Glance
These labels reflect the October 2026 institutional record. For the latest site position, quantities and quotations, use the project’s update link.
Main Masjid minaret
Recorded: October 2026
Request latest project updateExterior jali wall
Recorded: October 2026
Request latest project updateKitchen works
Recorded: October 2026
Request latest project updateBooks / Quran-related academic building
Recorded: October 2026
Request latest project update500-Acre Islamic Welfare City
A strategic vision. Land acquisition, secured funding and construction approval are not established by this concept.
Recorded: October 2026
Explore the proposed visionC-48, Umm-e-Rumman, water and solar updates are available through their project or partnership pathways. Completion percentages are not published without verified measurements.
Corporate & institutional partnerships
Build a Partnership Around a Verified Need
Discuss funding or suitable in-kind support with Jamia. Before committing, request a project brief covering the objective, beneficiary scope, current requirement, itemized budget or quotation, and available evidence and utilisation reporting.
Agree the contribution’s purpose and reporting arrangements with the team. Historical estimates remain separate from current funding requirements.
Historical construction estimates & source notes
Building-by-Building Historical Construction Estimate Register
Source: Jamia Baitul Ateeq, “Tamiraat aur Maujooda Imaraat”, original 12-page construction presentation (pages 2–11; presentation date not stated). The following amounts are historical estimates only, not expenditure paid, an approved current BOQ, an outstanding liability or a current fundraising target. Historical completion descriptions likewise require fresh on-site verification.
Current status correction (October 2026): the main Jamia Masjid building is COMPLETE. All four mosque-related rows below preserve historic PDF figures and source-era work descriptions only; they do not represent outstanding mosque construction. Current separately tracked additions are minaret, windows, planned solar, and exterior jali/kitchen work where still verified. Other building entries remain historical PDF references until their present progress is checked.
| Original component | Recorded area / floors | Status in historical presentation | Estimated cost | Source |
|---|---|---|---|---|
| Teaching & Residential Block 1 | 14,645 sq ft; 3 floors | 2 floors constructed; 1 floor (4,881 sq ft) listed as pending in this PDF | PKR 14,683,000 | p. 3 |
| Teaching & Residential Block 2 | 14,382 sq ft; 3 floors | 1 floor constructed; 2 floors (9,588 sq ft) listed as pending | PKR 28,764,000 | p. 4 |
| Teaching & Residential Block 3 | 9,027 sq ft; 3 floors | 3 floors listed as pending | PKR 27,081,000 | p. 5 |
| Main Mosque — Basement | 7,002 sq ft | Historical PDF: structural work complete, finishing then pending. Current master: main mosque complete. | PKR 10,503,000 | p. 6 |
| Main Mosque — Ground Floor / Mezzanine | 2,862 sq ft | Historical PDF: structural work complete, finishing then pending. Current master: main mosque complete. | PKR 4,293,000 | p. 7 |
| Main Mosque — Ground Floor Roof | 7,208 sq ft | Historical PDF: roof was pending when presented. Current master: main mosque complete. | PKR 21,624,000 | p. 7 |
| Main Mosque — Courtyard / Wudu Areas | 6,968 sq ft | Historic planning: courtyard, ablution and washrooms. Current master: main mosque building complete. | PKR 20,904,000 | p. 8 |
| School Building — Block 1 | 7,200 sq ft; 4 floors | Construction listed as pending in the source-era plan | PKR 21,600,000 | p. 9 |
| Teachers’ Residential Buildings — 1+1 | 14,720 sq ft; 4 floors | Construction listed as pending in the source-era plan | PKR 44,160,000 | p. 10 |
| Girls’ Madrasa Buildings — 1+1 | 2,992 sq ft; 4 floors | Construction listed as pending in the source-era plan; not assumed to be C-48 renovation | PKR 8,976,000 | p. 11 |
| Arithmetic total of the 10 historical estimates (not today’s required funding) | PKR 202,588,000 | p. 2 | ||
Historical per-square-foot estimate basis: the source presentation uses PKR 3,000 per sq ft for most pending floors and buildings, and PKR 1,500 per sq ft for the mosque basement (and the 2,862-sq-ft ground-floor/mezzanine section, as implied by its recorded PKR 4,293,000 total). These historic unit rates are not current market quotations. Source discrepancy to verify: Block 1 lists 4,881 sq ft of pending floor area at PKR 3,000 per sq ft, which mathematically equals PKR 14,643,000; however the PDF explicitly states PKR 14,683,000 — a PKR 40,000 difference. The register preserves the PDF amount without silently changing it, pending source-owner confirmation.
Important separation: this earlier Girls’ Madrasa buildings proposal (PKR 8,976,000) is not the same recorded transaction as the separately documented C-48 Women’s Campus renovation (PKR 1,173,260). The school-building estimate (PKR 21,600,000) is also separate from annual school staff salaries, books, and the proposed computer laboratory.
Before requesting construction funding: confirm the exact building identity and ownership, completed work, current site photographs, engineer-approved BOQ, itemized fresh quotations, expenditures already paid, remaining balance and project-specific restricted-fund records. Request the verified current scope through Jamia administration, or review the separate school and main mosque pages.
Current Development Priorities
- Main Jamia Masjid: the mosque building’s main construction is complete under the current institutional record. Only specified remaining works — minaret, windows, proposed solar and conditionally the exterior jali wall/kitchen work — are tracked for the current phase; verify their current stage and quotes. The old PDF’s mosque estimates are a historical record only, not a list of current unfinished construction. Current status and remaining facilities
- Academic development: planned building for the books / Quran-related academic section.
- School building & classrooms: the original construction PDF (p. 9) records School Building Block 1: 7,200 sq ft, 4 floors, historical estimated construction cost PKR 21,600,000. This original estimate has now been extracted and shown below; it is not a verified present balance. See school infrastructure and current educational needs.
- Other campus buildings & residences: the source PDF separately lists three madrasa teaching/residential buildings (PKR 14,683,000, PKR 28,764,000 and PKR 27,081,000), teachers’ residential buildings 1+1 (PKR 44,160,000) and girls’ madrasa buildings 1+1 (PKR 8,976,000). These are source-era estimates, not current needs, expenditures or automatically the same locations as later C-48 renovations. See the detailed ten-part historical register below; confirm current status and scope per building.
- C-48 Women’s Campus: women’s education campus with recorded renovation and development work. View project record
- Jamia Masjid Umm-e-Rumman: 600-gaz mosque project in Shah Town with verified material requirements. View project
- The Petrichor School: 57 course sets (PKR 184,300), management-reported annual school staff salaries across all school campuses (PKR 5,700,000), furniture needs and proposed 20-seat computer laboratory of approximately PKR 4.9 million. School project
- Utilities & infrastructure: verified water, electrical, solar, equipment and facility requirements.
CSR & Institutional Partnerships
Companies and institutions may support verified requirements through funding or suitable in-kind contributions including food and ration, educational resources, medical supplies, water systems, solar solutions, fans, furniture, appliances and infrastructure.
Official Donation Account
Meezan Bank
Account Title: Madrasah Jamia Baitul Ateeq Lil Beneen Wali-Banat
Account No: 1047-0108953902
IBAN: PK50MEZN0010470108953902
Before Funding a Project
- Request the latest verified requirement, quantity and quotation for variable-cost items.
- Confirm whether the contribution is general, restricted to a named project, or intended as Zakat.
- Review the relevant registration and audit records for institutional due diligence.
- For corporate support, request the project scope, beneficiary context and available utilisation reporting before commitment.
Request a Current Requirement or CSR Proposal
For current quotations, verified project requirements, sponsorship units, institutional documents or a campus visit, contact Jamia Baitul Ateeq directly. Verified campus locations and administrative relationships are listed in the Campuses & Educational Network directory.
WhatsApp / Mobile: +92 333 2226854
Landline: +92 21 34722201
Email: info@jamiabaitulateeq.org

